Projects


Skilled Labouers at 50 Bridge St, Sydney

Posted By: Perfect Hire Published: 21/09/2018 Times Read: 437 Comments 0
Skilled Labouers at 50 Bridge St, Sydney

Perfect Hire is currently supplying our client BG&E Construction and Engineering Services with a crew of four of our skilled team members to carry out investigation works. The scope of works for this project is to complete over 10,000 wall penetrations tests to determine the density and strength of the concrete.

Read more

Labour Hire at Cammeray

Posted By: Perfect Hire Published: 29/06/2018 Times Read: 483 Comments 0
Labour Hire at Cammeray

Perfect have been supplying our client Auric Projects a number of skilled and general labourers for a project at Cammeray. This project has been running since November 2017 and for the past 8 months our team members have been carrying out a number of duties on this project

Read more

Excavator / Operator & Labour Hire

Posted By: Perfect Hire Published: 14/11/2016 Times Read: 1486 Comments 0
Excavator / Operator & Labour Hire

Perfect Hire recently completed works at 46 Rose Street, Chippendale for EKOS. Perfect Hire provided 1.7t Yanmar Excavator and Operator to complete demolition and remediation works for this plumbing company which included digging trenches to lay piping, the removal of brick wall and rubble. We also supplied our Isuzu 67-190 Truck to remove all rubble and dirt from site and bring to tip. We completed 17 loads in our Isuzu MR Tipper Truck and the project was completed in four days.

Read more

Demolition at The Vibe Hotel - Labour Hire

Posted By: Perfect Hire Published: 16/05/2016 Times Read: 1368 Comments 0
Demolition at The Vibe Hotel - Labour Hire

Perfect Hire were engaged by Lemko and TOGA Group to carry out Demolition works at The Vibe Hotel at Rushcutters Bay. The work involved a back to base stripping out 253 guest rooms, which included the removal of Carpet, Bed Heads, TV Cabinet Units and Small Tile Removal in Bathroom's. Perfect Hire provided a team of eleven skilled demolition and rubbish removal labourers to carry out the works. All work was supervised by our Site Supervisor Moustapha Merhi to ensure safety of our team members and efficiency while carrying out the work. Work is currently still ongoing at The Vibe hotel.

Read more

Showing 1 to 4 of 4 (1 Pages)